Project Overview

Power EM designed and implemented an integrated HVAC system for a 200-bed specialty hospital, including 10 operating theatres, ICU/CCU, isolation wards, laboratories, and administrative areas.

Special Technical Requirements

Operating Theatres

  • Laminar Flow system with HEPA H14 filtration
  • Positive pressure +15 Pa vs corridors
  • Temperature: 18-24°C, Humidity: 45-60% RH
  • ACH: 20-25 (30% fresh + 70% recirculated)

Results Achieved

IndicatorTargetAchieved
Energy Consumption< 0.65 kW/ton0.58 kW/ton ✅
Air QualityISO Class 5ISO Class 4 ✅